Association Engineering company Our projects Services License and Certificates Contacts

COMPANY’S CONSTRUCTED OBJECTS

 
Description of highway
Name and length of highway
Country
Execution period
Cost of work in USD, mln
1
Highway M-05 Kiev-Odessa, the category 1b
part 278+320-290+900 with 6  highway stream crossings and 2 overpasss.
Ukraine
2003-2005
18,4
2
Warehouse (construction involve technology of stabilized layer of soil with using stabilizer and fluidizing agents)
Kiev, Korchevatoye 5600 m2
Ukraine
2006
0,4
3
Highway Astana-Borovoye, category 1b (construction involve technology of stabilized layer of soil with using stabilizer and fluidizing agents)
Ornek-Nikolskoye 129+ 461-140+425
Kazakhstan
2008-2009
28,6
4
Interfiled highway which connect gas-condensate fields in West Turkmenistan (construction involve technology of stabilized layer of soil with using stabilizer and fluidizing agents)
Sectionof the highway Ekerem-Gasankuli, Ekerem-Korpedzhe -1, general length is 32 km
Turkmenistan
2008-2011
9,5
5
Production highways of IV categories and industrial sites for LLC "Rostok 2” in Nikolayevsky region (construction involve technology of stabilized layer of soil with using stabilizer and fluidizing agents)
Ivanovka, Nikolayevsky region
5,5 km long highway and 12 000 m²  of industrial areas with solid covering
Ukraine
2010
3,3
6
 Sports and fitness complex, Odessky region (construction involve technology of stabilized layer of soil with using stabilizer and fluidizing agents)
Teplodar, Odessky region, area 8000 m2
Ukraine
2010
0,8
7
The Highway А-4 – category 1-А
1)        km 581+250 ÷ 622 +450
2)        km 581 + 250 ÷ 622+450
Poland
Poland
2010-2011
2011 -2012
46,4
18,6
8
Bypass highway of Hrubieszow (construction involve technology of stabilized layer of soil with using stabilizer and fluidizing agents)
        km 9 + 200
Poland
2011 -2012
47,6
9
Improvement of hotel complex "Bukovel” (construction involve technology of stabilized layer of soil with using stabilizer and fluidizing agents)
Highway - 6 km
Parking places       - 16000 m2
Ukraine
2011
1,5
10
The highway 1-B Kiev-Chop (construction involve technology of stabilized layer of soil with using stabilizer and fluidizing agents)
Highway М-06 km 14+080
km 128+000
Ukraine
2011 -2012
10,5

 

CONSTRUCTION INFIELD ROAD CONNECTS
GAS -CONDENSATE FIELDS OF WESTERN TURKMENISTAN

 

 

CONSTRUCTION OF ROAD PART M-05 KYIV – ODESSA

 

ROAD CONSTRUCTION ASTANA – BOROVOYE

 

PARTING PASS ROAD CONSTRUCTION AROUND HRUBESHUV CITY

 

3. Development scheme of international transport link Caucasus - Crimea - Europe

PJSC "Engineering Company Ecomat Oil and Gas” is General Contractor of international transport link Odessa-Nikolayev-Kherson-Kerch construction for road section Semisotka-Genichesk length 115 km and side with Arabat Spit.

 

PROJECT MANAGEMENT
ENGINEERING AND DESIGN
CONSTRACTING OF OIL-AND-GAS COMPLEX AND ENERGY SECTOR OBJECTS
EQUIPMENT AND MATERIALS
START-UP AND SET-UP WORKS
OPERATION AND MAINTENANCE
TRAINING
Веб дизайн и разработка сайта - Web-planet